In live event production, what the audience sees is only the final layer of a much larger system. The real success is built in the steps before the first light hits the stage, when ideas are still on paper, and the build exists only as a sequence of steps in our minds.
At PM1, we understand that the art of delivering a flawless event lies in mapping the journey from the final, desired result and then reverse-engineering every step to make it happen. This isn’t guesswork. It’s a calculated process that uses our decades of experience to identify the smartest, safest, and most cost-effective path forward.
Two factors consistently determine whether an event runs like clockwork or spirals into chaos: how early we’re brought into the process, and how strategically labor is planned.
When we’re part of the conversation early, we can design smarter and build with fewer compromises. When labor is scheduled with foresight, we keep crews productive, budgets in check, and timelines on track.
Let’s break down why these two elements are essential, straight from the experts who live it every day.
It’s not just about having “more lead time”, it’s about being involved at the right point in the planning cycle.
When clients invite us in at the concept stage, we can align the vision with the most effective solutions in the market, before designs lock in and costs escalate. We start with the end experience in mind, then deconstruct it into every step needed to get there.
Ryan Adams, PM1:
“Room drawings and past layouts can save hours of back-and-forth. The more we know up front, the faster we can make it happen.”
Example:
Just today, we reviewed a plan calling for a non-standard truss sizing. By adjusting the project’s scale by only a few inches, we kept the exact same visual impact while eliminating the need for a costly custom build. The result? Faster sourcing, lower costs, and no compromise to the creative vision.
With extra time, our team can:
Bottom line: Early engagement allows us to think beyond “what will work” and focus on “what will wow.”
Labor costs are often misunderstood as a simple line item on an invoice, but they’re really a reflection of planning. Misaligned schedules can lead to hours of paid downtime. Poor sequencing can cause teams to work on top of each other, slowing progress and creating safety hazards
David Baudier, PM1:
“Don’t bring your stage in at 8 a.m. when every other vendor is loading in. If you can, bring it in after rigging—otherwise you’re paying crews to sit for hours until they can work.”
Tom Baclawski, PM1:
“Jobs are won and lost in pre-production. Every environment is different, but the advance is what saves money, time, and dollars.”
When PM1 manages labor planning, we:
This isn’t just about saving money, it’s about delivering a smoother, more predictable event day.
The sequencing of design and implementation is where events are truly made. We begin with the vision, work backwards through each technical and logistical step, and then execute forward with precision. This process coupled with decades of production ensures your vision isn’t just built, but built in the most efficient and effective way possible.
At PM1, we’ve built our reputation on making the extraordinary look effortless. That’s not luck, it’s deliberate and it depends on committed partners who value collaboration and timing.