When the back of the room gets too far for a stage alone, raise the audience. PM1 builds tiered audience risers from stage decks, theater, classroom, or dinner style, with each row high enough to see over the one in front. Drawn to the room, the stage, and the screens, then built and struck by PM1 crew. Detroit, DC, Orlando, and worldwide when called.


Every PM1 riser job includes the drawing, the delivery, the build, and the strike. Each tier is set from the sightline to the stage and the screens, not from what fits on the truck.

Cars & Cigars, a cigar-themed fundraiser in metro Detroit, wanted dinner tables in an amphitheater. PM1 built dinner-table risers on top of the existing amphitheater seats, with custom wedge decks cut to follow the curve of the bowl, and has built it again year after year. When the room already has seats, the risers can go over them.
See how we workEach riser plan is drawn to the room, the program, and the view. If the layout isn't listed here, call it in.
Rows of chairs facing the stage, one or two chairs per level, for general sessions, award shows, and performances.
Tables at the deck fronts on each tier, so every row can write, eat, or work a laptop and still see the stage.
Rounds for 6, 8, or 10 on each level, for galas, weddings, and fundraisers where the back tables still need a clear view.
Curved and wedged tiers that fan out from the stage or wrap all the way around it, so the back row sits closer to the show.
An open room or a black box turned into a venue for a production, drawn to the stage design, for a quick run or a long-term install.
Decks built on top of fixed seats or bleachers, with custom wedge decks to follow a curve.
Accessible locations with companion seats, reached by ramp or lift and set on the layout from the first drawing.
Drum risers, rolling risers, and stage risers for the people on stage, skirted at any height.
The same drawing-first process, from a ballroom to a tent.
Risers at the back half of a long ballroom so the last rows see the stage, paired with large IMAG screens.
Dinner-style tiers that keep every table in the room and in the shot.
Risers leveled on grass or a grade under the tent, with stairs, rails, and aisles drawn in.
Tiers for families and the platform party, with ADA access as an option.
Audience tiers set for the camera plot, so the crowd reads behind the talent.
Every PM1 job runs the same five steps. One crew carries it from the first site walk to load-out.
Four questions start every job: what you're building, where it lands, scale and timeline, and what's already in motion. Scope and budget get defined before anything else does.
A site walk, then a CAD layout drawn to scale. Stage, seating, structures, cameras, power, and access on one drawing, coordinated with the venue and stamped by licensed engineers where the job requires.
The advance. Permitting, logistics, crew calls, and a load-in schedule every crew can use. This is where the show gets won.
Load-in to load-out, led on site by a PM1 production manager or structural site lead. One show caller. One show file. Doors open when every check is signed off.
A debrief and a financial review that closes the job. What worked, what could be tighter, and what the site taught us.
Specs
Built from the same deck system as PM1 stages.
| Spec | Value |
|---|---|
| Riser styles | Theater (1 or 2 chairs per level), classroom (tables at the deck fronts), dinner (rounds for 6, 8, or 10 per level) |
| Deck system | StageRight AF aluminum-frame decks |
| Deck sizes | 4' x 8', 4' x 6', 4' x 4', 3' x 8', 2' x 8', plus curves and wedges |
| Surfaces | Gray carpet, custom carpet cut to deck size, black textured fiberglass, plywood that takes scenic screws, aluminum |
| Tier rise and depth | Drawn per room, from the sightline to the stage and screens and the seating style on each level |
| Heights | 4" (deck only) to 13' on stocked understructure; entertainment scaffold above 13' |
| Edges and access | 42" guardrails in 2', 4', and 8' sections, chair rail, stairs and handrails, skirting; ADA ramps or lifts as an option |
| Load | 125 psf (4,000 lb per 4' x 8' deck), StageRight's standard rated capacity. Options above the standard rating on request. |
| Typical build | 1+ day for large rooms |
Seat and table counts come from the drawing.
Riser rental at PM1 covers the design, delivery, build, and strike of every tier, priced by the build. These are the questions planners ask before they book.

A site address, the scope of what you'd like PM1 to deliver, and a rough count of attendees are enough to start a drawing and an estimate.
Riser builds start at a $10K minimum investment.

Solutions for Every Stage™
Wherever you are in the build, this is where the next call goes.
Production infrastructure partner for high-visibility live events. Staging, seating, and structures for the builds that can't go wrong.
Phone
888-476-1776Event production insights and PM1 updates
© 2026 PM1, LLC. All rights reserved. Solutions for Every Stage™ The PM1 Way™